Frontpage - copy

Pre-standardisation
• Interconnection requirements of DER
• Grid-connected storage
• Photovoltaic modules
• Power-hardware-in-the-loop
• Electromagnetic compatability requirements for DER
• Static converters in grids
• Ancillary services
• Network protection
More Info

Pre-standardisation
• Interconnection requirements of DER
• Grid-connected storage
• Photovoltaic modules
• Power-hardware-in-the-loop
• Electromagnetic compatability requirements for DER
• Static converters in grids
• Ancillary services
• Network protection
More Info

Pre-standardisation
•Interconnection requirements of DER •Grid-connected storage •Photovoltaic modules •Power-hardware-in-the-loop •Electromagnetic compatability requirements for DER •Static converters in grids •Ancillary services •Network protection

slide 2 lemcko - copy

Testing
• Interconnection requirements of DER • Grid-connected storage • Photovoltaic modules • Power-hardware-in-the-loop • Electromagnetic compatability requirements for DER • Static converters in grids • Ancillary services • Network protection

Testing
• Interconnection requirements of DER • Grid-connected storage • Photovoltaic modules • Power-hardware-in-the-loop • Electromagnetic compatability requirements for DER • Static converters in grids • Ancillary services • Network protection

Testing
• Interconnection requirements of DER • Grid-connected storage • Photovoltaic modules • Power-hardware-in-the-loop • Electromagnetic compatability requirements for DER • Static converters in grids • Ancillary services • Network protection

Austrian Institute of Technology - copy

Research
• ERIGrid
• NETZ:KRAFT • NOBEL GRID • ELECTRA IRP • DEA Stabil

Research
• ERIGrid
• NETZ:KRAFT • NOBEL GRID • ELECTRA IRP • DEA Stabil

Research
• ERIGrid
• NETZ:KRAFT • NOBEL GRID • ELECTRA IRP • DEA Stabil

previous arrow
next arrow

Publications

This issue of the DERlab Activity Report presents the key research activities with a particular focus on effective remote operation and testing procedures developed by the DERlab community in 2021-2022.

This issue of the DERlab Activity Report presents the key research & activities contributing to the future, decarbonised and flexible electrical power grid in DERlab in 2018 – 2020.

This issue of the DERlab Activity Report presents the key activities in research and networking with focus on power system testing in DERlab in 2016 – 2017.