


Pre-standardisation
• Interconnection requirements of DER
• Grid-connected storage
• Photovoltaic modules
• Power-hardware-in-the-loop
• Electromagnetic compatability requirements for DER
• Static converters in grids
• Ancillary services
• Network protection
More Info
Pre-standardisation
• Interconnection requirements of DER
• Grid-connected storage
• Photovoltaic modules
• Power-hardware-in-the-loop
• Electromagnetic compatability requirements for DER
• Static converters in grids
• Ancillary services
• Network protection
More Info
Pre-standardisation
•Interconnection requirements of DER •Grid-connected storage •Photovoltaic modules •Power-hardware-in-the-loop •Electromagnetic compatability requirements for DER •Static converters in grids •Ancillary services •Network protection
Testing
• Interconnection requirements of DER • Grid-connected storage • Photovoltaic modules • Power-hardware-in-the-loop • Electromagnetic compatability requirements for DER • Static converters in grids • Ancillary services • Network protection
Testing
• Interconnection requirements of DER • Grid-connected storage • Photovoltaic modules • Power-hardware-in-the-loop • Electromagnetic compatability requirements for DER • Static converters in grids • Ancillary services • Network protection
Testing
• Interconnection requirements of DER • Grid-connected storage • Photovoltaic modules • Power-hardware-in-the-loop • Electromagnetic compatability requirements for DER • Static converters in grids • Ancillary services • Network protection
| 12th International Conference on Smart Energy Systems | Aalborg (DK), 22-23 September 2026 |
| Li-ion-Battery Europe 2026 | Barcelona (SP), 2-3 November 2026 |
| Enlit Europe | Vienna (AT), 10-12 November 2026 |
| Future Battery Forum | Berlin (DE), 24-25 November 2026 |
| More |

This issue of the DERlab Activity Report presents the key activities in research and networking with focus on power system testing in DERlab in 2016 - 2017.
















